Wednesday, February 13, 2013

THERMAL POWER PLANT.........


A thermal power station is a power plant in which the prime mover is steam driven. Water is heated, turns into steam and spins a steam turbine which drives an electrical generator. After it passes through the turbine, the steam is condensed in a condenser and recycled to where it was heated; this is known as a Rankine cycle. The greatest variation in the design of thermal power stations is due to the different fuel sources. Some prefer to use the term energy center because such facilities convert forms of heat energy into electricity. Some thermal power plants also deliver heat energy for industrial purposes, for district heating, or for desalination of water as well as delivering electrical power. A large part of human CO2 emissions comes from fossil fueled thermal power plants; efforts to reduce these outputs are various and widespread.


Introductory overview
Almost all coalnucleargeothermalsolar thermal electric, and waste incineration plants, as well as many natural gas power plants are thermal. Natural gas is frequently combusted in gas turbines as well as boilers. The waste heat from a gas turbine can be used to raise steam, in a combined cycle plant that improves overall efficiency. Power plants burning coal, fuel oil, or natural gas are often called fossil-fuel power plants. Some biomass-fueled thermal power plants have appeared also. Non-nuclear thermal power plants, particularly fossil-fueled plants, which do not use co-generation are sometimes referred to as conventional power plants.
Commercial electric utility power stations are usually constructed on a large scale and designed for continuous operation. Electric power plants typically use three-phase electrical generators to produce alternating current (AC) electric power at a frequency of 50 Hz or 60 Hz. Large companies or institutions may have their own power plants to supply heating or electricity to their facilities, especially if steam is created anyway for other purposes. Steam-driven power plants have been used in various large ships, but are now usually used in large naval ships. Shipboard power plants usually directly couple the turbine to the ship's propellers through gearboxes. Power plants in such ships also provide steam to smaller turbines driving electric generators to supply electricity. Shipboard steam power plants can be either fossil fuel or nuclear. Nuclear marine propulsion is, with few exceptions, used only in naval vessels. There have been perhaps about a dozen turbo-electric ships in which a steam-driven turbine drives an electric generator which powers anelectric motor for propulsion.
combined heat and power (CH&P) plants, often called co-generation plants, produce both electric power and heat for process heat or space heating. Steam and hot water lose energy when piped over substantial distance, so carrying heat energy by steam or hot water is often only worthwhile within a local area, such as a ship, industrial plant, or district heating of nearby buildings.


Efficiency
Rankine cycle with a two-stage steam turbine and a single feed water heater.
The energy efficiency of a conventional thermal power station, considered as salable energy as a percent of theheating value of the fuel consumed, is typically 33% to 48%. This efficiency is limited as all heat engines are governed by the laws of thermodynamics. The rest of the energy must leave the plant in the form of heat. Thiswaste heat can go through a condenser and be disposed of with cooling water or in cooling towers. If the waste heat is instead utilized for district heating, it is called co-generation. An important class of thermal power station are associated with desalination facilities; these are typically found in desert countries with large supplies ofnatural gas and in these plants, freshwater production and electricity are equally important co-products.
The Carnot efficiency dictates that higher efficiencies can be attained by increasing the temperature of the steam. Sub-critical fossil fuel power plants can achieve 36–40% efficiency. Super critical designs have efficiencies in the low to mid 40% range, with new "ultra critical" designs using pressures of 4400 psi (30.3 M Pa) and multiple stage reheat reaching about 48% efficiency. Above the critical point for water of 705 °F (374 °C) and 3212 psi (22.06 M Pa), there is no phase transition from water to steam, but only a gradual decrease in density.
Current nuclear power plants must operate below the temperatures and pressures that coal-fired plants do, since the pressurized vessel is very large and contains the entire bundle of nuclear fuel rods. The size of the reactor limits the pressure that can be reached. This, in turn, limits their thermodynamic efficiency to 30–32%. Some advanced reactor designs being studied, such as the Very high temperature reactorAdvanced gas-cooled reactor and Super critical water reactor, would operate at temperatures and pressures similar to current coal plants, producing comparable thermodynamic efficiency.
Electricity cost
The direct cost of electric energy produced by a thermal power station is the result of cost of fuel, capital cost for the plant, operator labour, maintenance, and such factors as ash handling and disposal. Indirect, social or environmental costs such as the economic value of environmental impacts, or environmental and health effects of the complete fuel cycle and plant decommissioning, are not usually assigned to generation costs for thermal stations in utility practice, but may form part of an environmental impact assessment.

In fossil-fueled power plants, steam generator refers to a furnace that burns the fossil fuel to boil water to generate steam.
In the nuclear plant field, steam generator refers to a specific type of large heat exchanger used in a pressurized water reactor (PWR) to thermally connect the primary (reactor plant) and secondary (steam plant) systems, which generates steam. In a nuclear reactor called a boiling water reactor (BWR), water is boiled to generate steam directly in the reactor itself and there are no units called steam generators.
In some industrial settings, there can also be steam-producing heat exchangers called [[heat recovery steam generators (HRSG) which utilize heat from some industrial process. The steam generating boiler has to produce steam at the high purity, pressure and temperature required for the steam turbine that drives the electrical generator.
Geothermal plants need no boiler since they use naturally occurring steam sources. Heat exchangers may be used where the geothermal steam is very corrosive or contains excessive suspended solids.
A fossil fuel steam generator includes an economizer, a steam drum, and the furnace with its steam generating tubes and superheater coils. Necessary safety valves are located at suitable points to avoid excessive boiler pressure. The air and flue gas path equipment include: forced draft (FD) fan, Air Preheater (AP), boiler furnace, induced draft (ID) fan, fly ash collectors (electrostatic precipitator or baghouse) and the flue gas stack.


Feed water heating and deaeration
The feed water used in the steam boiler is a means of transferring heat energy from the burning fuel to the mechanical energy of the spinning steam turbine. The total feed water consists of recirculated condensate water and purified makeup water. Because the metallic materials it contacts are subject to corrosion at high temperatures and pressures, the makeup water is highly purified before use. A system of water softeners and ion exchange demineralizers produces water so pure that it coincidentally becomes an electrical insulator, with conductivity in the range of 0.3–1.0 microsiemens per centimeter. The make-up water in a 500 MW plant amounts to perhaps 120 US gallons per minute (7.6 L/s) to replace water drawn off from the boiler drums for water purity management, and to also offset the small losses from steam leaks in the system.
The feed water cycle begins with condensate water being pumped out of the condenser after traveling through the steam turbines. The condensate flow rate at full load in a 500 MW plant is about 6,000 US gallons per minute (400 L/s).
The water is pressurized in two stages, and flows through a series of six or seven intermediate feed water heaters, heated up at each point with steam extracted from an appropriate duct on the turbines and gaining temperature at each stage. Typically, in the middle of this series of feed water heaters, and before the second stage of pressurization, the condensate plus the makeup water flows through a deaerator[7][8] that removes dissolved air from the water, further purifying and reducing its corrosiveness. The water may be dosed following this point with hydrazine, a chemical that removes the remaining oxygen in the water to below 5 parts per billion (ppb).[vague] It is also dosed with pH control agents such asammonia or morpholine to keep the residual acidity low and thus non-corrosive.


Boiler operation
The boiler is a rectangular furnace about 50 feet (15 m) on a side and 130 feet (40 m) tall. Its walls are made of a web of high pressure steel tubes about 2.3 inches (58 mm) in diameter.
Pulverized coal is air-blown into the furnace through burners located at the four corners, or along one wall, or two opposite walls, and it is ignited to rapidly burn, forming a large fireball at the center. The thermal radiation of the fireball heats the water that circulates through the boiler tubes near the boiler perimeter. The water circulation rate in the boiler is three to four times the throughput. As the water in the boiler circulates it absorbs heat and changes into steam. It is separated from the water inside a drum at the top of the furnace. The saturated steam is introduced into superheat pendant tubes that hang in the hottest part of the combustion gases as they exit the furnace. Here the steam is superheated to 1,000 °F (540 °C) to prepare it for the turbine.
Plants designed for lignite (brown coal) are increasingly used in locations as varied as GermanyVictoria, Australia and North Dakota. Lignite is a much younger form of coal than black coal. It has a lower energy density than black coal and requires a much larger furnace for equivalent heat output. Such coals may contain up to 70% water and ash, yielding lower furnace temperatures and requiring larger induced-draft fans. The firing systems also differ from black coal and typically draw hot gas from the furnace-exit level and mix it with the incoming coal in fan-type mills that inject the pulverized coal and hot gas mixture into the boiler.
Plants that use gas turbines to heat the water for conversion into steam use boilers known as heat recovery steam generators (HRSG). The exhaust heat from the gas turbines is used to make superheated steam that is then used in a conventional water-steam generation cycle, as described in gas turbine combined-cycle plants section below.


Boiler furnace and steam drum
The water enters the boiler through a section in the convection pass called the economizer. From the economizer it passes to the steam drum and from there it goes through downcomers to inlet headers at the bottom of the water walls. From these headers the water rises through the water walls of the furnace where some of it is turned into steam and the mixture of water and steam then re-enters the steam drum. This process may be driven purely by natural circulation (because the water is the downcomers is denser than the water/steam mixture in the water walls) or assisted by pumps. In the steam drum, the water is returned to the downcomers and the steam is passed through a series of steam separators and dryers that remove water droplets from the steam. The dry steam then flows into the super heater coils.
The boiler furnace auxiliary equipment includes coal feed nozzles and igniter guns, soot blowers, water lancing and observation ports (in the furnace walls) for observation of the furnace interior. Furnace explosions due to any accumulation of combustible gases after a trip-out are avoided by flushing out such gases from the combustion zone before igniting the coal.
The steam drum (as well as the super heater coils and headers) have air vents and drains needed for initial start up.


Superheater
Fossil fuel power plants often have a superheater section in the steam generating furnace. The steam passes through drying equipment inside the steam drum on to the superheater, a set of tubes in the furnace. Here the steam picks up more energy from hot flue gases outside the tubing and its temperature is now superheated above the saturation temperature. The superheated steam is then piped through the main steam lines to the valves before the high pressure turbine.
Nuclear-powered steam plants do not have such sections but produce steam at essentially saturated conditions. Experimental nuclear plants were equipped with fossil-fired super heaters in an attempt to improve overall plant operating cost.


Steam condensing
The condenser condenses the steam from the exhaust of the turbine into liquid to allow it to be pumped. If the condenser can be made cooler, the pressure of the exhaust steam is reduced and efficiency of the cycle increases.
The surface condenser is a shell and tube heat  exchanger in which cooling water is circulated through the tubes.[ The exhaust steam from the low pressure turbine enters the shell where it is cooled and converted to condensate (water) by flowing over the tubes as shown in the adjacent diagram. Such condensers use steam ejectors or rotary motor-driven exhausters for continuous removal of air and gases from the steam side to maintain vacuum.
For best efficiency, the temperature in the condenser must be kept as low as practical in order to achieve the lowest possible pressure in the condensing steam. Since the condenser temperature can almost always be kept significantly below 100 °C where the vapor pressure of water is much less than atmospheric pressure, the condenser generally works under vacuum. Thus leaks of non-condensible air into the closed loop must be prevented.
Typically the cooling water causes the steam to condense at a temperature of about 35 °C (95 °F) and that creates an absolute pressure in the condenser of about 2–7 kPa (0.59–2.1 inHg), i.e. a vacuum of about −95 kPa (−28.1 inHg) relative to atmospheric pressure. The large decrease in volume that occurs when water vapor condenses to liquid creates the low vacuum that helps pull steam through and increase the efficiency of the turbines.
The limiting factor is the temperature of the cooling water and that, in turn, is limited by the prevailing average climatic conditions at the power plant's location (it may be possible to lower the temperature beyond the turbine limits during winter, causing excessive condensation in the turbine). Plants operating in hot climates may have to reduce output if their source of condenser cooling water becomes warmer; unfortunately this usually coincides with periods of high electrical demand for air conditioning.
The condenser generally uses either circulating cooling water from a cooling tower to reject waste heat to the atmosphere, or once-through water from a river, lake or ocean.
The heat absorbed by the circulating cooling water in the condenser tubes must also be removed to maintain the ability of the water to cool as it circulates. This is done by pumping the warm water from the condenser through either natural draft, forced draft or induced draft cooling towers (as seen in the image to the right) that reduce the temperature of the water by evaporation, by about 11 to 17 °C (20 to 30 °F)—expelling waste heat to the atmosphere. The circulation flow rate of the cooling water in a 500 MW unit is about 14.2 m³/s (500 ft³/s or 225,000 US gal/min) at full load.
The condenser tubes are made of brass or stainless steel to resist corrosion from either side. Nevertheless they may become internally fouled during operation by bacteria or algae in the cooling water or by mineral scaling, all of which inhibit heat transfer and reduce thermodynamic efficiency. Many plants include an automatic cleaning system that circulates sponge rubber balls through the tubes to scrub them clean without the need to take the system off-line.[citation needed]
The cooling water used to condense the steam in the condenser returns to its source without having been changed other than having been warmed. If the water returns to a local water body (rather than a circulating cooling tower), it is tempered with cool 'raw' water to prevent thermal shock when discharged into that body of water.
Another form of condensing system is the air-cooled condenser. The process is similar to that of a radiator and fan. Exhaust heat from the low pressure section of a steam turbine runs through the condensing tubes, the tubes are usually finned and ambient air is pushed through the fins with the help of a large fan. The steam condenses to water to be reused in the water-steam cycle. Air-cooled condensers typically operate at a higher temperature than water-cooled versions. While saving water, the efficiency of the cycle is reduced (resulting in more carbon dioxide per megawatt of electricity).
From the bottom of the condenser, powerful condensate pumps recycle the condensed steam (water) back to the water/steam cycle.



Reheater
Power plant furnaces may have a reheater section containing tubes heated by hot flue gases outside the tubes. Exhaust steam from the high pressure turbine is passed through these heated tubes to collect more energy before driving the intermediate and then low pressure turbines.

Air path
External fans re provided to give sufficient air for combustion. The Primary air fan takes air from the atmosphere and, first warming it in the air preheater for better combustion, injects it via the air nozzles on the furnace wall.
The induced draft fan assists the FD fan by drawing out combustible gases from the furnace, maintaining a slightly negative pressure in the furnace to avoid backfiring through any closing



Electrical India Magazine


Electrical India Magazine

Electrical India magazine, India's oldest magazine on the electrical sector published by the chary group pf publications. It is an exclusive magazine on the air conditioning and refrigeration industry. View the latest issues and updates for electrical sector.

Clean, and affordable energy supply key for energy security through Indo-US cooperation

Both India and United States depend on foreign oil from unstable parts of the world. Energy challenges for both countries will grow in the future as traditional fuel sources are stretched. This calls for Indo-US co-operation to augment supply of clean, diverse and affordable energy sources, said Mr. C. A. Bud Albright, Under Secretary, United States Department of Energy, at the Round Table Session on US-India Energy Dialogue, jointly organized by Confederation of Indian Industry (CII) and US India Business Council (USIBC). According to him, the US is fully committed to research and technology development in critical areas such as nano-technology, hydrogen, advanced nuclear, biofuels and clean coal technologies. However, meeting future challenges effectively would require a change in fundamental rules of the present energy dynamics.
The private sector is a key player in technology development and licensing in the US and the present US administration encourages transfer of clean technologies by US companies to other countries. The real breakthrough innovations are likely to happen in the private sector, and India can contribute significantly in meeting future energy challenges, given its robust private entrepreneurship, emphasized Mr. Albright. Mr. R.V. Shahi, Chairman, India Infratech, in his welcome and opening remarks opined that dominance of coal in Indian energy mix is inevitable and therefore, concerted efforts are required on minimizing the adverse impacts of coal use in power generation. To this end, clean coal technologies and projects such as 'Futuregen' are extremely important. Technology is the key to ensure long-term sustainable development, said Mr. Ron Somers, President, US-India Business Council. The key drivers for the development of the energy sector in India would be market pricing, open access and transparency. India needs to push for successful replication of private distribution models of electricity to create viable demand centers, he added.


India & Israel join to build technologies for alternative energy

Potential synergy between India and Israel companies with characteristics of each side can be a winning combination in global context", said Mr Daniel Zohar Zonshine, Consul General of Israel at the CII interactive session on 'Renewable Energy Technologies: Opportunities for Collaboration with Israel' held in Mumbai. The Department of Science -Government of India, with the Confederation of Indian Industry (CII) has for the first time established a non-profit autonomous society - ‘Global Innovation and Technology Alliance’ (GITA) to manage bilateral industrial R&D programmes. The current session is aimed in providing a platform for the Indian and Israel companies to cooperate and collaborate in building newer technologies under the India-Israel Industrial R&D Programme. "With the deepening energy crisis and oil prices touching $100 a barrel, time has come to look at and develop alternative energy resources which are efficient and cost effective", stressed Mr Daniel Zohar Zonshine. Speaking on the importance of R&D in Israel, the Consul General mentioned that Israel is currently putting 4.7% of its GDP in R&D. "We have ideas and technologies and are now looking for cooperation to make renewable energy technologies economical", emphasized Mr Zonshine.

2012 INDIA BLACKOUTS.......


2012 India blackouts

The July 2012 India blackout was the largest power outage in history , occurring as two separate events on 30 and 31 July 2012. The outage affected over 620 million people, about 9% of the world population or half of India's population, spread across 22 states in Northern, Eastern, and Northeast India. An estimated 32 gigawatts of generating capacity was taken offline in the outage.[5] An article in The Wall Street Journal stated that of the affected population, 320 million initially had power, while the rest of the affected population lacked direct access.
Electrical power was restored in the affected locations between 31 July and 1 August 2012.


               

Background

The Indian electrical infrastructure was generally considered unreliable. The northern grid had previously collapsed in 2001. An estimated 27% of power generated was lost in transmission or stolen, while peak supply fell short of demand by an average of 9%.The nation suffered from frequent power outages that could last as long as 10 hours. Further, about 25% of the population, about 300 million people, had no electricity at all. Projections suggested India remained decades away from having a sufficient energy supply.
In the summer of 2012, leading up to the failure, extreme heat had caused power use to reach record levels in New Delhi . Due to the late arrival of monsoons, agricultural areas in Punjab and Haryana drew increased power from the grid for running irrigation pumps to paddy fields. The late monsoon also meant that hydro power plants were generating less than their usual production.   

Sequence of events

[edit]30 July

At 02:35 IST (21:05 UTC on 29 July), the 400 kV Bina-Gwalior line tripped. As this line fed into the Agra-Bareilly transmission section, the station also tripped, and power failures cascaded through the grid. All major power stations were shut down in the affected states, causing an estimated shortage of 32 GW. Officials described the failure as "the worst in a decade".
On the day of the collapse, Power Minister Sushil Kumar Shinde stated that the exact cause of the failure was unknown, but that at the time of the failure, electricity use was "above normal". He speculated that some states had attempted to draw more power than permitted due to the higher consumption. Spokesperson for Power Grid Corporation of India Limited (PGCIL) and the Northern Regional Load Dispatch Centre (NRLDC) stated that Uttar PradeshPunjaband Haryana were the states responsible for the overdraw. PGCIL's chairman also stated that electrical service was restored "at a record time".
A senior director for an Indian power company described the outage as "a fairly large breakdown that exposed major technical faults in India’s grid system. Something went terribly wrong which caused the backup safety systems to fail."
More than 300 million people, about 25% of India's population, were without power. Railways and some airports were shut down until 08:00. The busiest airport in North India, Delhi Airport, was able to remain open, because it switched to back-up power in 15 seconds. The outage caused "chaos" for Monday morning rush hour, as passenger trains were shut down and traffic signals were non-operational. Trains stalled for three to five hours.Several hospitals reported interruptions in health services,while others relied on back-up generators. Water treatment plants were shut down for several hours, and millions were unable to draw water from wells powered by electric pumps.
The Associated Chambers of Commerce and Industry of India stated that the blackout had "severely impacted" businesses, leaving many unable to operate.Oil refineries in PanipatMathura and Bhatinda continued operating because they have their own captive power stations within the refineries and do not depend on the grid.
It took 15 hours to restore 80% of service.

[edit]31 July

The system failed again at 13:02 IST (07:32 UTC), due to a relay problem near the Taj Mahal. As a result, power stations across the affected parts of India again went offline. NTPC Ltd. stopped 38% of its generation capacity. Over 600 million people (nearly half of India's population), in 22 out of 28 states in India, were without power.
More than 300 intercity passenger trains and commuter lines were shut down as a result of the power outage. The worst affected zones in the wake of the power grid's collapse were NorthernNorth CentralEast Central, and East Coast railway zones, with parts of EasternSouth Eastern and West Central railway zones. The Delhi Metro suspended service on all six lines, and had to evacuate passengers from trains that stopped mid-journey, helped by the Delhi Disaster Management Authority.
About 200 miners were trapped underground in eastern India due to lifts failing, but officials later said they had all been rescued.
The National Disaster Management Authority (NDMA), not normally mandated to investigate blackouts, began to do so because of the threat to basic infrastructure facilities like railways, metro rail system, lifts in multi-storey buildings, and movement of vehicular traffic.
The following states were affected by the grid failure:
However, the following regions not affected at all:
  • Narora and Simbhaoli in Uttar Pradesh
  • parts of Delhi such as Badarpur
  • areas served by Sterlite and Ib Thermal Power Station (most of western Orissa)
  • most of the Kolkata municipal area (CESC system)

[edit]1 August

According to the officials of Uttar Pradesh Power Corporation Limited, the 400 kV double circuit line between Gwalior and Agra faced "dangerous overloading" on the evening of August 1 and could have triggered another power outage. The tripping was prevented when the powerpersons realised that the line load had reached 800 MW and scaled it down to 600 MW by cutting off the electricity to many parts that were fed by this line.
As of 2 August, Uttar Pradesh was being supplied about 7 GW power, while the demand was between 9 and 9.7 GW.                            

Prior disaster-proofing

Before the grid collapse, the private sector spent $29 billion to build their own independent power stations in order to provide reliable power to their factories. The 5 biggest consumers of electricity in India have private off-grid supplies. Indian companies have 35 GW of private off-grid generation capacity and plan to add another 33 GW to their off-grid capacity.
Some villages that were not connected to the grid were not affected, such as Meerwada, Madhya Pradesh which has a 14 kW solar power station built by US-based firm for $125,000.

[edit]Reactions

On the day of the collapse, Power Minister Sushil Kumar Shinde ordered a three-member panel to determine the reason for the failure and report on it in fifteen days. In response to criticism, he observed that India was not alone in suffering major power outages, as blackouts had also occurred in the United States and Brazil within the previous few years.
The Washington Post described the failure as adding urgency to Indian Prime Minister Manmohan Singh's plan for a US$400 billion overhaul of India's power grid. His plan calls for a further 76 gigawatts of generation by 2017, produced in part by nuclear power.
Rajiv Kumar, secretary general of the Federation of Indian Chambers of Commerce and Industry (FICCI) said, "One of the major reasons for the collapse of the power grid is the major gap between demand and supply. There is an urgent need to reform the power sector and bring about infrastructural improvements to meet the new challenges of the growing economy.
On 1 August 2012, newly appointed Power Minister Moodbidri Veerappa Moily stated, "First thing is to stabilize the grid and it has to sustain. For that we will work out a proper strategy." He declined to blame specific states, saying, "I don't want to start with the blame game.
Team Anna, the supporters of anti-corruption activist Anna Hazare, charged that this grid failure was a conspiracy to suppress the indefinite fast movement started on 25 July 2012 for the Jan Lokpal Bill and targeting Sharad Pawar.
Some technology sources and USAID proposed that another widespread outage could be prevented by integrated network of microgrids and distributed generation connected seamlessly with the main grid via a superior smart grid technology which includes automated fault detectionislanding and self-healing of the network.

[edit]Investigation

The three-member investigation committee consisted of S. C. Srivastava, A. Velayutham and A. S. Bakshi, and issued its report on 16 August 2012. It concluded that four factors were responsible for the two days of blackout:
  • Weak inter-regional power transmission corridors due to multiple existing outages (both scheduled and forced)
  • High Loading on 400 kV Bina-Gwalior-Agra link.
  • Inadequate response by State Load Despatch Centers (SLDCs) to the instructions of Regional Load Despatch Centres (RLDCs) to reduce overdrawal by the Northern Region utilities and underdrawal/excess generation by the Western Region utilities.
  • Loss of 400 kV Bina-Gwalior link due to mis-operation of its protection system.
The committee also offered a number of recommendations to prevent further failures, including an audit of the protection systems
BBC NEWS

Hundreds of millions without power in India

Hundreds of millions of people have been left without electricity in northern and eastern India after a massive power breakdown.
More than half the country was hit by the power cuts after three grids collapsed - one for a second day.
Hundreds of trains have come to a standstill and hospitals are running on backup generators.
The country's power minister has blamed the crisis on states drawing too much power from the national grid.
The breakdowns in the northern, eastern, and north-eastern grids mean around 600 m people have been affected in 20 of India's states.
HINDUSTAN TIMES
World's biggest blackout: 67 crore Indians without power
Punjab keasri
BLACK MONDAY...........