Wednesday, February 13, 2013

Guru Nanak Dev Thermal Plant

1)
Location
Bathinda (Punjab)
2)
Main Features
Highest Generation achievement in 2007-08 (3008MU)
Highest PLF in March 1987 (88.14%)
Lowest Ever yearly aux. consumption 2002-03 (9.32% without T&E Losses)
Lowest DM Water make up in 2004-05 (2.02%)
Lowest Oil Consumption in 2002-03 (1.35ml/Kwh)
3)
No. of Power House
ONE
4)
No. of Unit
FOUR
5)
Total generating capacity
4 x 110 MW = 440 MW
6)
Source of water supply
Canal water
7)
Fuel Used
Primary Fuel: Bituminous coal with calorific value 3500-4500 kcal/kg
Secondary Fuel: Fuel oil/L.D.O./HPS/FO with calorific value of 9,000 to 10,000 K.Cal / liter.
8)
Turbine
Three casing type impulse turbines 110 MW capacity with 3000 rpm, 29 stages with exhaust pressure 0.08 kg/sq. cm
9)
Generator
BHEL make three phase synchronous type  110 MW,11000 V with H2 cooling and DC/Static exciter ( 2 units with Static Exciter & 2 units with separate DC exciter)
10)
Commissioning
U-1 = 22.9.74   U-2 = 19.9.75
U-3 = 29.3.78   U-4 = 31.1.79
Date of commissioning after R&M :
U-1 = 15.04.2007 U-1 = 19.01.2006
11)
Cost of Project
Original Cost: Rs. 115 Crores
R&M Cost for U#1 & U#2= Rs. 229 Crore
R&M Cost for U#3 & U#4= Rs. 465 Crore