1)
|
Location
|
Bathinda (Punjab)
|
2)
|
Main Features
|
Highest Generation achievement in 2007-08 (3008MU)
Highest PLF in March 1987 (88.14%) Lowest Ever yearly aux. consumption 2002-03 (9.32% without T&E Losses) Lowest DM Water make up in 2004-05 (2.02%) Lowest Oil Consumption in 2002-03 (1.35ml/Kwh) |
3)
|
No. of Power House
|
ONE
|
4)
|
No. of Unit
|
FOUR
|
5)
|
Total generating capacity
|
4 x 110 MW = 440 MW
|
6)
|
Source of water supply
|
Canal water
|
7)
|
Fuel Used
|
Primary Fuel: Bituminous coal with calorific value 3500-4500 kcal/kg
Secondary Fuel: Fuel oil/L.D.O./HPS/FO with calorific value of 9,000 to 10,000 K.Cal / liter. |
8)
|
Turbine
|
Three casing type impulse turbines 110 MW capacity with 3000 rpm, 29 stages with exhaust pressure 0.08 kg/sq. cm
|
9)
|
Generator
|
BHEL make three phase synchronous type 110 MW,11000 V with H2 cooling and DC/Static exciter ( 2 units with Static Exciter & 2 units with separate DC exciter)
|
10)
|
Commissioning
|
U-1 = 22.9.74 U-2 = 19.9.75
U-3 = 29.3.78 U-4 = 31.1.79 Date of commissioning after R&M : U-1 = 15.04.2007 U-1 = 19.01.2006 |
11)
|
Cost of Project
|
Original Cost: Rs. 115 Crores
R&M Cost for U#1 & U#2= Rs. 229 Crore R&M Cost for U#3 & U#4= Rs. 465 Crore |
Wednesday, February 13, 2013
Guru Nanak Dev Thermal Plant